Iai-america XSEL-QX Manuel d'utilisateur Page 117

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 558
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 116
93
Part 1 Installation
Chapter 9 Maintenance
x Routine maintenance and inspection are necessary so that the system will operate properly at all times.
Be sure to turn off the power before performing maintenance or inspection.
x The standard inspection interval is six months to one year. If the environment is adverse, however, the
interval should be shortened.
1. Inspection Points
x Check to see if the supply voltage to the controller is inside the specified range.
x Inspect the ventilation holes in the controller and remove dirt, dust and other foreign objects, if any.
x Inspect the controller cables (controller o actuator) and check for any loose screws or cable
disconnection.
x Check the controller mounting screws, etc., for looseness.
x Inspect each cable (axis link cable, general purpose I/O cable, system I/O cable, power cable) for
loose connection, disconnection, play, etc.
Vue de la page 116
1 2 ... 112 113 114 115 116 117 118 119 120 121 122 ... 557 558

Commentaires sur ces manuels

Pas de commentaire